Design-build coordination
Design-build means the design and the construction sit under one contract with one party answerable for both. The practical difference shows up on the day the drawings and the price disagree, because that argument happens inside our office rather than across your kitchen table.
One contract,
one answer.
What it replaces
The conventional route is design-bid-build. You hold one contract with an architect and a separate one with a builder. The architect draws, the set goes out to bid, and you are the party standing between the two when the numbers come back.
That structure is not wrong, and on some projects it is the right one. What it does is put the owner in the middle of every disagreement about whether something was drawn buildable or priced fairly.
Pricing while the design is still on paper
The expensive version of a custom project goes: months of drawing, a set issued for bid, bids over budget, and then paying the architect a second time to draw it smaller.
Pre-construction pricing means the design gets costed as it develops. When a detail is unaffordable you hear it while it is still a line on a drawing, which is the cheapest moment it will ever be to change.
A schedule of values before anything is built
Before construction starts you get the job broken into line items with a value against each. Draws are then tied to work that is finished rather than to dates on a calendar.
It also gives you a document to argue with. A single lump sum is impossible to question; a schedule of values tells you what you are paying for and lets you challenge any line of it.
Somebody owns the paperwork
Permit submittal, plan-check corrections, engineering revisions, and the architectural review package if a committee applies. Four permitting authorities operate inside this valley and each expects its own submittal.
On a split contract this is the work that falls between the architect and the builder, because it belongs to neither of them by default. Here it is ours, and chasing it is not billed to you as a change.
What it does not fix
You still need an architect. Design-build changes who holds the contract, not whether the house needs designing, and we are not a substitute for that work.
It also removes the competitive bid, which is a real thing to give up. The honest way to replace it is to ask for the subcontractor bids behind each line, ask what is allowance and what is priced, and ask what happens to the money if a line comes in under. We will answer all three. A builder who will not is the reason that question exists.
What this covers.
- 01One contract covering design and construction
- 02Pre-construction pricing as the design develops
- 03Schedule of values issued before construction
- 04Architect and engineer coordination
- 05Permit submittal and plan-check corrections
- 06Architectural review packages where a committee applies
- 07Draws tied to completed work
- 08Subcontractor bids shown on request
Asked before
signing anything.
Do I still need an architect?
Yes. Design-build decides who holds the contract, not whether the drawings need doing. What changes is that the architect and the builder are answerable to the same party rather than to each other through you.
Can you work with an architect I have already hired?
Yes, and it is common. If you have a designer you trust, keep them. We come in alongside to price the work as it develops and to run the submittals, which is most of the benefit without starting the design again.
Without competitive bids, how do I know the price is fair?
By asking to see what it is built from. Subcontractor bids behind the major lines, a clear split between what is priced and what is an allowance, and a stated answer on what happens if a line lands under budget. Those three questions do the work a bid pool used to do.
When should a builder come in?
Before the design is finished. The value of pre-construction pricing is in what it changes, and once a set is complete and permitted, most of what it would have told you is expensive to act on.
The arrangement, in brief.
- The contract
- One, covering design and construction
- Pricing
- During design, not after the set is issued for bid
- Draws
- Against a schedule of values, tied to finished work
- Paperwork
- Submittals, corrections and review packages are ours
- The trade-off
- No competitive bid; ask to see the subcontractor pricing
- Licences
- NV B‑2 #0091645
NV C‑17 #0092664
NV C‑3 #0092662
Related
Custom home construction
Whole-home remodel
Our mission
Talk to us
Tell us what you are building. We will tell you what it involves and where the money usually goes.
Or call (702) 913‑7007 · info@nxgbuilds.com