Outdoor living
A Las Vegas backyard earns its cost in the months you can stand to be in it. Shade, water and light add months to that count, and each needs gas, power or footings planned before the deck goes down.
-
01 The pool
Under the deck,
a shell in the ground.A licensed pool contractor builds the pool under NXG’s contract. Across much of the Las Vegas valley the excavation meets caliche, and the lines to the equipment pad cross the yard below the deck. NXG plans the deck, gas, power and drainage around them.
-
02 The barrier
Close the yard
around the water.A pool needs a barrier, and your authority sets what counts: the walls on the lot lines, a gate that closes and latches on its own, and protection on the doors from the house. NXG draws the barrier with the pool, so the inspector sees it on the plans.
-
03 Shade
Shade stands
on footings.A ramada or pergola is a structure, with posts on footings and a permit where your authority requires one. Which way it faces decides whether you sit under it in July, so NXG settles the orientation before anyone digs.
-
04 Gas and power
Route every line
before the deck.The fire pit and a gas pool heater need gas. The pump, the pool lights and the landscape lights need power. NXG routes each line before the deck goes down, and licensed trade partners run them under permit.
-
05 Evening
Light the yard
for the hours you use it.In a Las Vegas summer you use the yard after sunset. Pool and spa lights, uplights, path lights and the fire pit each go on a circuit planned with the rest, instead of an extension cord added later.
Build the yard
for July.
Face it away from the afternoon sun
A west-facing patio takes the worst of the afternoon and will be uncomfortable in July regardless of the roof over it. South is manageable with enough overhang. East gives you mornings and shade by mid-afternoon.
Where the structure cannot move, the answer is depth of overhang, screening on the exposed side, and fans placed for air movement rather than symmetry. Misting and heaters extend the Las Vegas shoulder seasons at both ends.
Pools and spas, under one contract
A licensed pool contractor builds the pool and spa under NXG’s contract and on NXG’s schedule. NXG holds no swimming-pool classification.
What NXG answers for is everything the pool touches: the deck around it, gas to a heater, power to the pump and lights, and where the water drains when it rains. NXG takes on a pool as part of a larger outdoor project or a build.
The barrier and the bonding
The code your authority enforces requires a barrier around a pool and sets what counts. Walls on the lot lines, gates that close and latch on their own, and alarms or other protection on doors from the house are the usual parts. NXG draws the barrier with the pool rather than after it.
An electrician bonds the steel in the shell, the metal near the water and the deck around it to one another, as the electrical code requires. That work sits under the deck, so it happens before the pavers go down.
Shade is a structure
Anything roofed and attached to the house is a structure: footings sized for the load, a connection detail at the existing roof or wall, and a permit with an inspection. A freestanding ramada or pergola stands on footings too.
The tie-in is where attached covers go wrong. A patio cover fixed into a fascia that was never meant to carry it is a leak, a sag or both, and it usually surfaces in the first serious rain rather than at the final walk-through.
Fire, light and the lines behind them
A gas fire pit or fireplace needs a gas line sized for it and for anything else on the same run, a permit and an inspection. Set it where its manufacturer’s clearances allow, clear of any cover above.
Landscape and path lights run at low voltage from a transformer on an outdoor circuit. Pool and spa lights need ground-fault protection and their own place in the electrical plan. Pulling wire under a finished deck means lifting the deck, so the electrician places the transformer and runs the wire first.
Outdoor kitchens
Gas, power, water and a drain all reach an outdoor kitchen from the house, each in a trench. The kitchen, from the trench to the counter, has its own page and model: outdoor kitchens.
What this covers.
- 01Orientation and shade timing assessed before layout
- 02Pool and spa built by a licensed pool contractor under NXG’s contract
- 03Pool barrier drawn with the pool
- 04Decking, gas, power and drainage around the pool
- 05Footings and permits for ramadas, pergolas and patio covers
- 06Gas fire pits and fireplaces, permitted and inspected
- 07Landscape, path, pool and spa lighting on planned circuits
- 08Misting systems and patio heaters
- 09Architectural review submittal where a committee applies
What owners ask
about the back yard.
Do you build pools?
As part of a larger outdoor project or a build, yes. A licensed pool contractor builds the pool under NXG’s contract and schedule, and NXG handles the deck, gas, power and drainage around it. NXG holds no swimming-pool classification.
What does a pool need besides the pool?
A barrier your authority accepts, an equipment pad with power, and gas if the heater burns it. An electrician bonds the shell steel, the metal near the water and the deck. Decide early where the equipment pad goes: a pump makes noise, so keep it away from bedroom windows.
Will I use it in summer?
That depends on which way it faces more than on what you build. A west-facing patio takes the worst of the afternoon and will be uncomfortable in July regardless of the roof over it. South is manageable with enough overhang. Where the structure cannot move, the answer is depth of overhang, screening on the exposed side, and fans placed for air movement rather than symmetry.
Does a patio cover need a permit?
Yes in unincorporated Clark County, which requires a building permit for attached and freestanding covers alike; the cities set their own rules. An attached cover needs footings sized for the load, a connection detail at the existing roof or wall, and an inspection. The tie-in is where these go wrong. A patio cover fixed into a fascia that was never meant to carry it is a leak, a sag or both, and it surfaces in the first serious rain.
Can I add a gas fire pit?
Usually. It needs a gas line sized for it and for anything else on the same run, plus a permit and an inspection. Set it where its manufacturer’s clearances allow, clear of any cover above, and run the line before the deck goes down.
What lighting should go in?
Plan it with the yard. Landscape and path lights run at low voltage from a transformer, and pool and spa lights need ground-fault protection. Run the wire before the deck and the planting go in, because lifting a finished deck to pull wire costs more than the lights.
Related
Outdoor kitchens
Luxury additions & ADUs
Casitas and guest houses
Further reading
Does a patio cover or pergola need a permit?
What the code requires around a residential pool
Talk to us
Tell us what you are building. We will tell you what it involves and where the money usually goes.
Or call (702) 913‑7007 · info@nxgbuilds.com
Tell us what
you’re building.
Send the details below or call. We reply within one business day.
- Phone
- (702) 913‑7007
- info@nxgbuilds.com
- Office
- 3277 E Warm Springs Rd, Ste 200
Las Vegas, NV 89120 - Hours
- Monday–Friday, 8:00am–5:00pm
Saturday, 10:00am–3:00pm - Licenses
- NV B‑2 #0091645
NV C‑17 #0092664
NV C‑3 #0092662
Message received
Thank you. We have your message and will reply within one business day. If it is urgent, call (702) 913‑7007.